TransManche Link

Transmanche Link (TML) , created in April 1986, is a consortium of ten companies of BTP (five Frenchwomen and five British) charged to build the Channel tunnel.

Memory of the Transmanche :

tunnels

Design of the works

Works out of the commun run

  • Program and objective
  • the Geology: With the research of the blue Chalk
  • the layout: Full and long sinuosities
  • Topography: to join the two ends.
  • Technical and methods

Tubes and rooms

  • the Coating: a solid carapace
  • the Branches: from one tube to another
  • the Pumping station
  • the railway Crossing
  • the Gate of Beussingues
  • the final installation of the Well of Sangatte
  • works of surface

Realization of the works

Installations of Sangatte

  • buildings of surface
  • the Well of Sangatte: a gigantic heart
  • the equipment of the well
  • spoil: how to get rid
  • of it provisioning of the convoys
  • the operation of the sector well-surface

Design with the first turns of wheel

  • the Tunneller S
  • Five prototypes
  • the assembly of the tunnellers in the well
  • How to work in dry ground
  • the Digging: like a mole and a caterpillar
  • the piloting computer-assisted
  • the coating: longest Alarming specter
  • the railway equipment: six ways for the face
  • industrial water: two feeder systems
  • electricity: working installed capacity: 80.000 KW
  • the Pumping out: to drain the tunnels
  • ventilation: to bring oxygen to the face

Tunnels under sea

  • the Tunnel under sea T1: the exploit with a prototype
  • teams of the T1
  • tunnellers T2 and T3
  • the T3: a “formula 1”
  • the T3 with the use
  • teams of T2 and T3
  • the Junction of the tunnels
  • measurements after junction

Tunnels under ground

  • the Tunnel under ground T4
  • the T5/T6: a spectacular Reversal
  • teams of the tunnels under ground

The special Works

  • the Branches: a building site with share
  • the Pumping station W3: a realization into traditional
  • the railway crossing

The Equipment of the tunnels

Transport - Communication and safety

  • the PCC: the Watchtower of the networks
  • the Transport in tunnel
  • Three communication networks
  • safety initially
  • personnel in gallery

The material, provisioning

The Prefabrication of the coating

  • 250000 Voussoir S
  • a platform of 20 hectares
  • Cages reinforcing: 35.000 tons of steel
  • to mould 550.000 m ³ concrete
  • a concrete high strength - Vibration high frequency
  • lifespan of the moulds
  • Maintenance and provisioning
  • an organization of industrial style
  • total Quantities and ratios

The Final of the Channel tunnel

  • the visible part of the Lien fixes
  • Pharaonic earthworks
  • an essential consolidation
  • the installations of the terminal
  • the Works of art of the terminal
  • F 40: Building of maintenance
  • the installation of the railways of the terminal
  • the organization of the sub-project
  • Hygiene and safety
  • staff training

The fixed equipment

  • the Transport system of the Channel tunnel
  • the fixed equipment
  • Installations of building site
  • Assembly of the fixed equipment in tunnel
  • Electrical installations of the mechanical tunnels
  • Equipment of the special Works
  • Organization of the sub-project
  • Hygiene and safety
  • Quantities and outputs

The organization of TML

  • Flow chart
  • Commercial department
  • Direction quality assurance
  • Direction of human resources
  • Administrative office and financial
  • Data-processing

External bonds